
White Papers
Eaton's white papers demonstrate how our technology solutions can best address your needs and solve your most pressing business problems.
| Title | Publication Date
|
Type | Size |
| Successful Facility-Wide Energy Management System Addition at a Minerals Processing Plant
This paper outlines the successful integration of a facility-wide energy management system into various Ash Grove cement plant facilities. |
6/17/2013 |
|
973 KB |
| Generator circuit breakers have special requirements for generator protection
This paper summarizes unique and demanding aspects of protecting generator circuits and compares differences between the requirements for generator circuit breakers and those for standard distribution circuit breakers. |
5/31/2013 |
|
291 KB |
| Aiming for grid parity on utility-scale solar applications
The next generation of utility-scale inverters—stepping up to reduce the cost of solar energy |
5/30/2013 |
|
588 KB |
| The Journey of an Enterprise in a Process Industry Toward Improved Electrical Workplace Safety
This paper is based on a case study of Eatons Engineering Services arc flash compliance project at Lehigh Hansons 14 cement plants throughout North America. It received the Best Conference Technical Paper award at the 2013 Institute of Electrical and Electronics Engineers Industrial Applications Society/Portland Cement Association (IEEE IAS/PCA) Cement Industry Technical Conference. |
5/23/2013 |
|
511 KB |
| High voltage circuit breaker standards—comparative guide
This paper will analyze and compare the similarities and differences among the requirements of these electrical circuit breaker standards. |
5/22/2013 |
|
141 KB |
| Grid support stability for reliable, renewable power
Understand why energy storage is fundamental to large-scale solar projects |
2/15/2013 |
|
366 KB |
| Choosing between a soft starter and a variable frequency drive to fit your application
Choosing between a soft starter and a variable frequency drive often depends on the application, system requirements, and cost (both for initial startup and over the life cycle of the system). |
1/31/2013 |
|
592 KB |
| Underground mining systems—the invisible and looming danger
If people aren’t in harm’s way, they can’t get hurt. Seems reasonable, right? Of course, this is the reason that many mines are trending toward automation and remote monitoring of electrical systems. |
12/13/2012 |
|
420 KB |
| Arc-preventative motor control centers
Arc-preventative MCCs enhance personnel safety, protect equipment and support more reliable operations. |
11/30/2012 |
|
790 KB |
| Variable frequency drives: energy savings for pumping applications | 11/09/2012 |
|
786 KB |
| AC Versus DC Power Distribution
Issues to consider when comparing options for improving data center energy efficiency |
10/29/2012 |
|
466 KB |
| Recommended Installation Practices for CHSPT1 and CHSPT2 Products
UL1449 3rd Edition Surge Products – Eaton Type 1 & 2 Surge Products |
10/17/2012 |
|
64 KB |
| Understanding Eaton Energy Saver System
A technical review of how Eaton ESS enhances reliability and efficiency |
10/09/2012 |
|
873 KB |
| Replacement of hydro plant generator oil circuit breakers with modern vacuum technology
The successful implementation of vacuum generator circuit breakers for this hydro-plant project confirms the practical application and performance of vacuum circuit breakers in the 5000A range. |
9/28/2012 |
|
445 KB |
| The integrated HMI-PLC
The heart of a “lean automation” solution |
8/31/2012 |
|
306 KB |
| Rethinking Data Center Design
Building the room around the rack can ease cooling challenges and save money |
7/31/2012 |
|
1.1 MB |
| Active energy control-optimum solution for maximum savings
Saving energy is more than the right thing to do |
6/22/2012 |
|
186 KB |
| Modernizing Vintage Data Centers
Improving the reliability, efficiency and effectiveness of older computing facilities by upgrading their power and cooling systems |
5/30/2012 |
|
1004 KB |
| Power Management for Server Virtualization
Strategies for preserving business continuity and data integrity in virtualized data centers |
4/20/2012 |
|
256 KB |
| Distributed versus centralized power backup strategies
Choosing the right UPS deployment architecture for your data center |
2/07/2012 |
|
226 KB |