Electrical United States | Worldwide Sites | eaton.com   

WHITE PAPERS


Downloads
   

Power Management for Server Virtualization 4/20/12 256 KB
Distributed versus centralized power backup strategies 2/7/12 226 KB
What You Need to Know About Arc Flashes 1/31/12 1.1 MB
Eaton’s Power Xpert W.A.G.E.S. Monitoring and Reporting Solution Eliminates Guesswork and Complexity 1/18/12 799 KB
Transparent Failover for Power Xpert and Foreseer Software Utilizing VMware HA Services 1/18/12 641 KB
Capacitor Application Issues 11/17/11 330 KB
UPS Basics 10/18/11 1.0 MB
Proper application of switching devices for PV installations 10/7/11 269 KB
Fault Characteristics in Electrical Equipment 9/19/11 2.2 MB
Realizing energy savings in water processing applications using medium voltage adjustable frequency drives 8/24/11 375 KB
The ABCs of small hydro upgrade and automation 6/30/11 736 KB
A Step Closer Toward Maintenance-Free Gear 6/13/11 652 KB
Next Generation Operator Interfaces Shorten OEM Time To Market 6/10/11 241 KB
Increasing Uptime and Efficiency with Switched PDUs 5/19/11 280 KB
Overcoming Eight Common Power Management Challenges 2/10/11 940 KB
Maximizing UPS Availability 1/4/11 484 KB
Arc Flash Safety in 400V Data Centers 12/22/10 250 KB
Clarifications on the use of Department of Energy Design-Line 6, 7, and 8 transformers contained within 10 CFR 430 and 431, Energy Conservation Program for Commercial Equipment: Distribution Transformers Energy Conservation Standards 12/20/10 547 KB
Optimizing your Infrastructure for Cloud Computing 8/31/10 578 KB
Evaluating Efficiency and Losses of Various Circuit Protective Devices (Overvew) 8/5/10 347 KB
Evaluating Efficiency and Losses of Various Circuit Protective Devices (Detailed) 8/5/10 3.5 MB
Is power protection costing you more than it should? 7/2/10 146 KB
Demand Response! Power FROM the People 6/11/10 1.4 MB
UPS Service Plans: How to Maximize Your Returns 5/25/10 310 KB
Unleashing Stranded Power and Cooling from New and Existing Data Centers 4/30/10 1.7 MB
Optimizing Power Distribution for High-Density Computing 4/22/10 313 KB
Powering Through the Economy 3/22/10 142 KB
No Harmony in Harmonics 2/3/10 612 KB
Emerging UPS Standby Power Sources - Four Promising Alternatives to the Lead Acid Battery 1/4/10 189 KB
Is an energy wasting data center draining your bottom line? 11/23/09 767 KB
The Reliability of Neutral Point Clamped vs. Cascaded H-Bridge Inverters 10/27/09 250 KB
Right-Sizing Your Power Infrastructure 10/26/09 597 KB
Which UPS is right for the job? 9/1/09 2.5 MB
Transient Overvoltages on Ungrounded Systems from Intermittent Ground Faults 8/31/09 838 KB
10 Ways to Increase Power System Availability in Data Centers 8/22/09 686 KB
3-Pole and 4-Pole Transfer Switch Switching Characteristics 8/21/09 3.5 MB
Power Monitoring 101 7/13/09 801 KB
A Quantitative TCO Comparison of 400v AC and 600v AC Power Systems 6/22/09 834 KB
The Vector Approach to Data Center Power Planning 6/4/09 415 KB
Is your data center running out of power or cooling? 5/30/09 494 KB
What your IT equipment needs from a UPS 4/30/09 534 KB
Increase Server Energy Efficiencies by Using High-Voltage Power Supplies and 208V UPSs 4/15/09 119 KB
Straight Talk about Electrolytic Capacitors in your UPS 3/23/09 77 KB
The ABCs of UPS Service 3/22/09 38 KB
Choosing a UPS Service Plan 3/22/09 58 KB
The Benefits of a Preventive Maintenance Service Plan for your UPS 3/22/09 259 KB
Is your data center ready for virtualization? 3/15/09 498 KB
The necessary convergence of IT and Facilities 3/4/09 1.7 MB
Power Considerations for VoIP 2/15/09 183 KB
Redefining the economics of running the modern data center 2/13/09 1.1 MB
Parallel UPS configurations 1/20/09 406 KB
Modularity in the data center power infrastructure 11/1/08 1.2 MB
Increase the efficiency of power distribution in your high-density data center 10/15/08 507 KB
Considering the effects of UPS operation with leading power factor loads 8/11/08 129 KB
Is power your weakest link in data center flexibility? 7/15/08 51 KB
Ten Ways to Protect Your IT Infrastructure 6/15/08 52 KB
Distributing Power to Blade Servers 5/13/08 38 KB
Data Center – Unique Characteristics and the Role of Medium Voltage Vacuum Circuit Breakers 3/13/08 1.6 MB
High Power UPS Achieves Significant Size and Weight Reductions While Enhancing Performance 3/11/08 887 KB
Electrical Equipment Floor Space: Selected NEC Code Requirements and New Options for the Electrical System Designer 1/16/08 373 KB
Power factor as it relates to UPS products 1/2/08 58 KB
Branch Circuit Protection for High Density 208V Power Solutions 11/15/07 131 KB
Energy efficient transformers reduce data center utility costs 11/14/07 74 KB
Powerware eNotify Remote Monitoring and Diagnostics Service 5/13/07 1.3 MB
Who tripped the circuit? 2/8/07 134 KB
Static Auto Tie Mean Time Between Failure Calculations 1/13/07 65 KB
Surge Suppression Takes the Bite Out of Transients 10/1/06 564 KB