Eaton Moeller® series DILM Replacement coil, Tool-less plug connection, RAC 240: 190 - 240 V 50/60 Hz, AC, For use with: DILM115, DILM150, DILM170, DILMP125 - DILMP200
Product Name |
Eaton Moeller® series DILM replacement coil
|
Catalog Number |
230112
|
EAN |
4015082301125
|
Product Length/Depth |
51 mm
|
Product Height |
110 mm
|
Product Width |
63.2 mm
|
Product Weight |
0.245 kg
|
Certifications |
UL
CSA File No.: 012528 UL 508 CSA IEC/EN 60947-4-1 UL File No.: E29096 CE CSA Class No.: 2411-03, 3211-04 UL Category Control No.: NLDX CSA-C22.2 No. 14-05 |
Accessories |
Individual coils
|
Product category |
Accessories
|
Voltage type |
AC
|
Ambient operating temperature - min |
-25 °C
|
Ambient operating temperature - max |
60 °C
|
Rated control supply voltage (Us) at AC, 50 Hz - min |
190 V
|
Rated control supply voltage (Us) at AC, 50 Hz - max |
240 V
|
Rated control supply voltage (Us) at AC, 60 Hz - min |
190 V
|
Rated control supply voltage (Us) at AC, 60 Hz - max |
240 V
|
Rated control supply voltage (Us) at DC - min |
0 V
|
Rated control supply voltage (Us) at DC - max |
0 V
|
10.2.2 Corrosion resistance |
Meets the product standard's requirements.
|
10.2.3.1 Verification of thermal stability of enclosures |
Meets the product standard's requirements.
|
10.2.3.2 Verification of resistance of insulating materials to normal heat |
Meets the product standard's requirements.
|
10.2.3.3 Resist. of insul. mat. to abnormal heat/fire by internal elect. effects |
Meets the product standard's requirements.
|
10.2.5 Lifting |
Does not apply, since the entire switchgear needs to be evaluated.
|
10.2.6 Mechanical impact |
Does not apply, since the entire switchgear needs to be evaluated.
|
10.2.7 Inscriptions |
Meets the product standard's requirements.
|
10.3 Degree of protection of assemblies |
Does not apply, since the entire switchgear needs to be evaluated.
|
10.4 Clearances and creepage distances |
Meets the product standard's requirements.
|
10.5 Protection against electric shock |
Does not apply, since the entire switchgear needs to be evaluated.
|
10.6 Incorporation of switching devices and components |
Does not apply, since the entire switchgear needs to be evaluated.
|
10.7 Internal electrical circuits and connections |
Is the panel builder's responsibility.
|
10.8 Connections for external conductors |
Is the panel builder's responsibility.
|
10.9.2 Power-frequency electric strength |
Is the panel builder's responsibility.
|
10.9.3 Impulse withstand voltage |
Is the panel builder's responsibility.
|
10.9.4 Testing of enclosures made of insulating material |
Is the panel builder's responsibility.
|
10.11 Short-circuit rating |
Is the panel builder's responsibility. The specifications for the switchgear must be observed.
|
10.12 Electromagnetic compatibility |
Is the panel builder's responsibility. The specifications for the switchgear must be observed.
|
10.13 Mechanical function |
The device meets the requirements, provided the information in the instruction leaflet (IL) is observed.
|