Project overview
This hydro facility consists of two 9500kVA turbine generators operating at 4.16kV. The system also consists of multiple remote controlled gate houses. Eaton was awarded a turnkey contract as the Electrical & Control Equipment (ECE) contractor to design, supply and install the upgraded protection and control systems for the facility. Eaton’s complete overhaul of the controls systems enhances the ability of the utility to remotely monitor the condition and status of the generating plant. Resulting in faster response times to plant issues and greatly shortened start-up and shut-down times.
Project scope
For this project Eaton supplied the following:
As part of the turnkey solution Eaton provided: