Need product support?
CYME user portal: my.cyme.com
P: 450 461 3655 or 800 361 3627 (Canada and USA)
Questions before you buy
Time overcurrent plots are generated within the user-friendly interface of Eaton's CYME software, which offers:
Not only does Eaton's CYME software provide the useful tools listed above to make any study simple, it also offers advanced analyses to assist engineers in examining the coordination and protection range of the devices on the network more closely.
Protective device analysis can be used to verify the coordination, protective reach and loading of all protective devices in a network. Radial coordination and parallel branches coordination are supported.
Main capabilities include:
Minimum fault analysis is offered to assist engineers in the verification of whether the protective devices can adequately detect and clear the minimum faults seen in their respective protection zone.
A detailed report is provided to list all areas that are inadequately protected. Those areas are also colour-coded on the one-line diagram for easier visualisation.
Sequence of operation analysis evaluates the impact of a temporary or permanent fault on the network to provide the sequence of protective device operations triggered.
Main capabilities include:
Eaton’s CYME Protective Device Analysis module helps power engineers effectively address protection issues by analysing time-current curves.
Need product support?
CYME user portal: my.cyme.com
P: 450 461 3655 or 800 361 3627 (Canada and USA)
Questions before you buy