Need product support?
CYME users portal: my.cyme.com
P: 450-461-3655 or 800-361-3627 (Canada and US)
Questions before you buy
Eaton's CYME Load Flow Contingency (N-p) module allows the simulation of multiple “what-if” situations in a batch analysis. Those “what-if” cases represent the loss and/or disconnection of a device. All system modifications related to a contingency refer to the base case network. Several contingencies can be concurrently defined to represent a network operation adverse scenario, including the following:
Eaton’s CYME N-p load-flow analysis module is designed to assist in contingency analysis of grid networks.
Need product support?
CYME users portal: my.cyme.com
P: 450-461-3655 or 800-361-3627 (Canada and US)
Questions before you buy